Multi-dimensional BIM adoption at the city scale: determinants, barriers, and performance implications in Da Nang
Tóm tắt: 0
|
PDF: 0
##plugins.themes.academic_pro.article.main##
Author
-
Thi-Bich-Thuy NguyenInstitute of Research and Development, Duy Tan University, Vietnam; Faculty of Civil Engineering, Duy Tan University, VietnamQuang-Tam NgoFaculty of Architecture, Duy Tan University, VietnamPhu-Anh-Huy PhamInstitute of Research and Development, Duy Tan University, Vietnam; Faculty of Civil Engineering, Duy Tan University, Vietnam
Từ khóa:
Tóm tắt
This study investigates the determinants of multi-dimensional Building Information Modeling (BIM-nD) adoption and its relationship with organizational performance among construction-related firms in Da Nang, Vietnam. An analytical framework integrating the Technology–Organization–Environment (TOE) framework and BIM maturity concepts was developed to conceptualize BIM adoption as a progressive capability-building process. Survey data from 102 firms were analyzed using Partial Least Squares Structural Equation Modeling (PLS-SEM) with bootstrapping. The results show that human competency is the strongest positive driver of BIM-nD adoption, whereas technological capability and external pressure exert significant negative effects. Organizational readiness and cost–benefit feasibility show no significant influence. BIM-nD adoption is also negatively associated with organizational performance, indicating short-term transitional challenges. The findings highlight the need to align human capability, organizational processes, and institutional support to enable effective BIM-nD implementation.
Tài liệu tham khảo
-
[1] N. H. Tran and N. T. Ngo, “Potential applications of Digital Twin and BIM technology in construction industry”, The University of Danang - Journal of Science and Technology, vol. 23, no. 9D, pp. 106–112, 2025. https://doi.org/10.31130/ud-jst.2025.23(9D).573E
[2] V. T. Nguyen, A. D. Mai, and N. T. Ngo, “An application of Building Information Modeling (BIM) in construction schedule management – A case study of Olalani Riverside Tower project”, The University of Danang - Journal of Science and Technology, vol. 23, no. 10C, pp. 13–17, 2025. https://doi.org/10.31130/ud-jst.2025.23(10C).657E
[3] N. T. Ngo, A. D. Pham, and A. D. Mai, “Development of an artificial intelligence model for predicting building energy consumption in Danang city”, The University of Danang - Journal of Science and Technology, vol. 22, no. 11A, pp. 20–24, 2024. https://jst-ud.vn/jst-ud/article/view/9431
[4] P. N. Gade and T. H. Nguyen, “Challenges in adopting Building Information Modelling (BIM) in Vietnam: A decade’s perspective”, in Proceedings of the 18th East Asia-Pacific Conference on Structural Engineering and Construction, Volume 3: EASEC-18, Chiang Mai, Thailand. Singapore: Springer, 2024, pp. 24–30. https://doi.org/10.1007/978-981-95-0090-1_4
[5] T. Q. Nguyen and D. P. Nguyen, “Barriers in BIM adoption and legal considerations in Vietnam”, International Journal of Sustainable Construction Engineering and Technology, vol. 12, no. 1, 2021. https://doi.org/10.30880/ijscet.2021.12.01.027
[6] N. V. Tam, T. N. Diep, N. Q. Toan, and N. L. D. Quy, “Factors affecting the adoption of Building Information Modeling in construction projects: The case of Vietnam”, Cogent Business & Management, vol. 8, no. 1, 2021. https://doi.org/10.1080/23311975.2021.1918848
[7] N. V. Tam, N. Q. Toan, and V. V. Phong, “Investigating potential barriers to construction digitalization in emerging economies: A study in Vietnam”, International Journal of Information Management Data Insights, vol. 4, no. 1, Art. no. 100226, 2024. https://doi.org/10.1016/j.jjimei.2024.100226
[8] L. D. T. Tin, D. T. Sy, and N. T. Viet, “Identifying barriers to BIM-nD implementation in construction project management”, Journal of Materials and Construction – Ministry of Construction (Vietnam), vol. 14, 2024. https://doi.org/10.54772/jomc.06.2024.804
[9] H. N. Minh, “Barriers to the integrated implementation of BIM and GIS in public construction projects in Vietnam”, Journal of Materials and Construction – Ministry of Construction (Vietnam), vol. 15, pp. 254–259, 2025. https://doi.org/10.54772/jomc.03.2025.968
[10] T. V. Tran, H. V. V. Tran, and T. A. Nguyen, “A review of challenges and opportunities in BIM adoption for construction project management”, Engineering Journal, vol. 28, no. 8, pp. 79–98, 2024. https://doi.org/10.4186/ej.2024.28.8.79
[11] O. I. Olanrewaju, A. F. Kineber, N. Chileshe, and D. J. Edwards, “Modelling the impact of Building Information Modelling (BIM) implementation drivers and awareness on the project lifecycle”, Sustainability, vol. 13, no. 16, Art. no. 8887, 2021. https://doi.org/10.3390/su13168887
[12] M. Ghobakhloo and M. Iranmanesh, “Digital transformation success under Industry 4.0: A strategic guideline for manufacturing SMEs”, Journal of Manufacturing Technology Management, vol. 32, no. 8, pp. 1533–1556, 2021. https://doi.org/10.1108/JMTM-11-2020-0455
[13] A. O. Daoud, A. E. Oke, A. K. Singh, I. O. Famakin, K. M. Abdel Aziz, and T. M. Olayemi, “Exploring the Building Information Modelling benefits for sustainable construction using PLS-SEM”, Scientific Reports, vol. 15, Art. no. 35781, 2025. https://doi.org/10.1038/s41598-025-14020-0
[14] H. A. Mohamed, N. Hashim, N. M. Yusuwan, M. H. Hanafiah, and S. M. Shamsuddin, “Assessing cost and benefit attributes of Building Information Modelling (BIM) implementation in a Malaysian public agency: A PLS-SEM approach”, Journal of Information Technology in Construction, vol. 29, pp. 308–323, 2024. https://doi.org/10.36680/j.itcon.2024.015
[15] A. R. Radzi, N. F. Azmi, S. N. Kamaruzzaman, M. Algahtany, and R. A. Rahman, “Challenges in construction readiness for BIM-based building projects”, Journal of Asian Architecture and Building Engineering, vol. 24, no. 4, pp. 1689–1704, 2025. https://doi.org/10.1080/13467581.2024.2343803
[16] G. E. Takyi-Annan and H. Zhang, “Assessing the impact of overcoming BIM implementation barriers on BIM usage frequency and the circular economy in the project lifecycle using partial least squares structural equation modelling (PLS-SEM)”, Energy and Buildings, vol. 295, Art. no. 113329, 2023. https://doi.org/10.1016/j.enbuild.2023.113329